PMS carries out the production of reinforced concrete floating pier and reinforced concrete floating breakwater with its own unique designs.
It has the possibility of dimensioning, detailing and production according to the project demands and requirements without the dependence on information based on foreign countries. PMS uses more than 10 years of R&D and application experience in its works on reinforced concrete floating systems.
In these studies, it often cooperates with scientific institutions such as Middle East Technical University and Yıldız Technical University Coastal-Port Engineering departments.
To date, production has been carried out from 1.0 ton finger pier buoyancy block to 185.0 ton floating breakwater block as a reinforced concrete floating system element. It was able to design and produce a reinforced concrete floating dock block up to 1.5m wide for a special purpose.
As standard, PMS produces reinforced concrete floating dock units from 2.4 m to 4.0 m in width and from 10.0 m to 20.0 m in length. When the on-site production condition can be met, the production range has increased to floating blocks with a width of 8.0 m and a length of 20.0 m. In case of demand, it is possible to produce wider and longer blocks on site.
As in the width and length dimensions, production can be made outside of the dimensions such as 0.45-0.50-0.55 m, which are standard in the surface line, freeboard, dimension.
Reinforced concrete floating breakwater production has been made for various projects from 4.0 m wide to 8.0 m. Their length is generally 20.0 m, and their total height is from 2.0 m to 5.0 m. Keel height dimensions and surface line, freeboard, dimensions are handled separately for each project requirement.
Hot-dip galvanized reinforced concrete steel is used in all reinforced concrete manufacturing. Reinforced concrete is C40 with fiber additive. The floating dock and floating breakwater blocks assembly parts are all made of hot-dip galvanized steel or stainless steel. Steel cable fasteners with high bearing capacity and flexible properties are used in the connection of floating blocks to each other. The contact points are equipped with specially designed neoprene wedges. ISO 9001-2008 quality management is taken as basis in design, project planning and production processes. PMS can also provide project support for floating marine structures. In this context, there are many projects approved by official authorities both at home and abroad.
Simply fill out the application form. Our team will contact you as soon as possible.
It can be used to moor boats up to 30 in length, to create multi-purpose floating platforms and floating areas.
Aluminum piers are suitable for use in sheltered areas and areas where the wave height does not exceed 70 cm.
Thanks to its 6005T6 aluminum body, it is resistant to sea water and is not affected by corrosion. Thanks to its polyethylene floaters, it is resistant to sea water for many years and to the sun thanks to its UV additive. With the standard composite material, which is the coating material, it provides non-slip and lasts for many years under sea conditions.
There are different solutions for different regions, chain, vault; pile connections are fixed on the water with the help of arms from the quay or with wheels that can slide on the HEA profile. Our engineers also offer the most suitable solution according to the location.
Thanks to its special fender system, it prevents your boat from being damaged by the impacts that may occur with the movement of the water while it is connected to the pier. Protects the pier and your boat.
The floaters are filled with a foam system called polystyrene. The buoyancy of the pontoon continues thanks to this system, which makes it difficult to get water even if the buoyant is punctured. Damaged floaters can be replaced with new ones. You can contact our technical team for more information.
Floating systems can be easily mounted from the place where they are installed. The pontoon shape and settlement can be played, if desired, by opening the merging and fixing systems.
If requested, we provide transportation and assembly services. For this, we need information such as regional conditions, depth, wind conditions.
We are at your service with our wide product range consisting of 26 years of Rotation manufacturing experience!
Having started its new facility in Izmir/Kemalpasa with a total area of 20,000 m2, 11,000 m2 of which is closed, PMS has expanded its production capacity and storage areas and has reached the ability to respond to customer needs much more quickly, and an integrated plastics processing facility with the diversification of market needs and demands. became like that.
The visual and technical elements on our website are for promotional purposes, and changes can be made by PMS.
© 2023 Pms.com.tr ALL RIGHTS RESERVED.
Visit our stand at the exhibition to explore our latest polyethylene products and discuss potential collaborations. We look forward to meeting you at Hall 5, Stand 05.771!